Background:
In 2015, the District conducted a Project Analysis Report (PAR) on Inlet View. The outcome of the PAR included scope of work and cost estimates for three different options, to include a building life extension (BLE), a comprehensive renewal, and a school building replacement.
In 2017, the District hired a consultant (Western Demographics) to conduct an external capacity study of the District. The consultant strongly recommended replacing the existing building (built in 1957) with a new structure to accommodate up to 300 students, which is the average number of elementary age students living within Inlet View’s boundaries.