• ASD bond logo

    King Tech High School Earthquake Repairs – $380,000

     

    Bond work at KTHS will extend the school's life expectancy by 25+ years.

     

  • Bond Work at King Tech


    • Repair flooring
    • Repair cracks in interior Concrete Masonry (CMU) block walls
    • Repair cracks in interior partition walls
    • Ceiling repairs
    • Heating, Ventilation and Electrical seismic bracing
  • damage at KTHS